“How long will it take?” is one of the first questions every owner asks, and the honest answer is a range, not a date. A phinisi is built by hand, in the open, from natural materials — so the schedule depends on size, finish and a few things outside anyone’s control. Here is how the time actually breaks down.

The headline range

From keel-laying to launch, most builds run twelve to twenty-four months. A compact 28–30 metre liveaboard is often fourteen to eighteen months; a large 40-metre-plus luxury yacht with a full interior can run beyond two years. See indicative bands on the cost and timeline page.

Stage by stage

Stage Share of the build
Keel, shell and framing The hull’s structural core; several months
Deck, superstructure and rig Runs partly in parallel with systems
Engines, tanks and systems Sequenced with the interior
Interior fit-out Often the longest single stage on a luxury build
Commissioning and sea trial Weeks, not months, but not to be rushed

What stretches a schedule

Three things most often move a launch date. First, timber: the right ironwood and bitti has to be sourced and seasoned. Second, weather: the yard is an open beach, and a hard wet season slows outdoor work. Third, the interior: a demanding fit-out can take as long as building the hull. A realistic schedule builds in margin for all three.

How to read a yard’s schedule

A trustworthy build schedule is tied to milestones you can verify, not to a single promised launch day. When you commission a build , the contract sets stage-based milestones — keel, shell, systems, interior, sea trial — so progress is measured against work done, not the calendar. That is the honest way to plan a two-year project.

Why rushing a build costs more

A build hurried to hit a date usually pays for it later — in green timber that opens seams, in a fit-out finished carelessly, in a sea trial that finds problems a calmer schedule would have prevented. A realistic timeline with margin is not slowness; it is the cheapest path to a boat that lasts.

Planning your ownership around the schedule

A two-year build is a planning horizon. Crew recruitment, certification , marketing for a charter vessel and delivery all have to be timed against launch. The milestone structure of a commissioned build gives an owner the visibility to plan those steps with confidence.