“How long will it take?” is one of the first questions every owner asks, and the honest answer is a range, not a date. A phinisi is built by hand, in the open, from natural materials — so the schedule depends on size, finish and a few things outside anyone’s control. Here is how the time actually breaks down.
The headline range
From keel-laying to launch, most builds run twelve to twenty-four months. A compact 28–30 metre liveaboard is often fourteen to eighteen months; a large 40-metre-plus luxury yacht with a full interior can run beyond two years. See indicative bands on the cost and timeline page.
Stage by stage
| Stage | Share of the build |
|---|---|
| Keel, shell and framing | The hull’s structural core; several months |
| Deck, superstructure and rig | Runs partly in parallel with systems |
| Engines, tanks and systems | Sequenced with the interior |
| Interior fit-out | Often the longest single stage on a luxury build |
| Commissioning and sea trial | Weeks, not months, but not to be rushed |
What stretches a schedule
Three things most often move a launch date. First, timber: the right ironwood and bitti has to be sourced and seasoned. Second, weather: the yard is an open beach, and a hard wet season slows outdoor work. Third, the interior: a demanding fit-out can take as long as building the hull. A realistic schedule builds in margin for all three.
How to read a yard’s schedule
A trustworthy build schedule is tied to milestones you can verify, not to a single promised launch day. When you commission a build , the contract sets stage-based milestones — keel, shell, systems, interior, sea trial — so progress is measured against work done, not the calendar. That is the honest way to plan a two-year project.
Why rushing a build costs more
A build hurried to hit a date usually pays for it later — in green timber that opens seams, in a fit-out finished carelessly, in a sea trial that finds problems a calmer schedule would have prevented. A realistic timeline with margin is not slowness; it is the cheapest path to a boat that lasts.
Planning your ownership around the schedule
A two-year build is a planning horizon. Crew recruitment, certification , marketing for a charter vessel and delivery all have to be timed against launch. The milestone structure of a commissioned build gives an owner the visibility to plan those steps with confidence.